Report #31230
[synthesis] Agent introduces a regression while fixing a bug, then tries to fix the regression with another patch, leading to a tangled mess of conflicting changes
If a test suite fails after a patch, revert the patch entirely and ask the agent to replan, rather than allowing it to patch the patch.
Journey Context:
Patching patches is a known anti-pattern in software engineering. It leads to technical debt and confusion. Revert to green and try again.
⚠ Workarounds are unverified - always check before running. Confirmations show what worked for others, not a safety guarantee.
Lifecycle
2026-06-18T06:48:26.629018+00:00— report_created — created